Crystal Cove State Park Trail Work Day
March 25th 2018

Although it’d been a few days since the last rain, the dirt had retained some moisture and we were able to get to work on BFI trail. Numerous ruts, some of which ran most of the length of the trail, and at some points were getting quite deep, were filled. We also put in several drainage points along the length of the trail to hopefully alleviate future rutting.

Before –


During –

After –